Cleaning, grainsize classification and dewatering of soils

The commitment of SERECO GESTIÓN to decontamination and sludge treatment is evident in our active participation in major national and international projects from the initial planning stages to carrying out the work.

After participation in a pilot test for filtration and desorption in 2007, currently we have been hired by the Ebre-Flix joint venture for the Management of the Plant of Granulometric Classification and Sludge Dewatering within the European Project for Chemical Decontamination of the Flix Reservoir (Tarragona).

The reservoir decontamination aims to restore the Ebro River to its original state as it was before the chemical companies began to pour contaminated sludge into the river for over nearly a century.

More than 4 million m3 of sludge will be dredged and the operations of granulometric classification and dewatering will generate 1,000,000 tonnes of dry matter to be decontaminated through oxidation processes using thermal desorption.

The work will take place over approximately twenty-one and a half months and SERECO GESTIÓN will manage all the technical (granulometric classification plant and dehydration) and human resources (over 30 people) to ensure continued work on a d 24 hour daily basis.